May 6
Bids in
17 days

West Harrison County Center Drainage Improvements #18000

Long Beach, MS - Mississippi Gulf Coast Community College (G-NR-E)

Status

Accepting Bids

Bid Date 5/6/25 10:00am

Company & Contacts

MS Gulf Coast Community College
Damon Torricelli, P.E. (Neel-Schaffer)  

The Mississippi Gulf Coast Community College, hereafter referred to as Owner, will receive sealed bids for the drainage improvements project for the West Harrison County Center located at 21500 B. Street, Long Beach, Mississippi, until 10:00 A.M., Local Time, May 6, 2025, for supplying all labor, equipment, and materials (as specified) necessary for the construction of the above referenced project. All the bids received will be publicly opened and read aloud in the conference room of the Administration Building of the West Harrison County Center. The work shall consist of installing a trench drain, polyethylene pipe and end section, and a junction box. Other work items include the removal of planters and concrete pavers, relocating a HVAC unit, and the removal and replacement of some concrete sidewalks.

The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor, equipment and materials required by the specifications and the drawings referred to therein.

Bidder must be qualified under Mississippi Law and show current Certificate of Responsibility issued by the Mississippi State Board of Public Contractors establishing his classification as to the value and type of construction on which he is authorized to bid.

Each Bidder shall write his Certificate of Responsibility Number on the outside of the sealed envelope containing his proposal.

Proposals shall be sealed and deposited with the Owner prior to the time and date hereinbefore designated.

Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident bidder's state awards contracts to Mississippi Contractors bidding under similar circumstances. To ensure that Mississippi's so-called Golden Rule is followed state law requires a non-resident bidder is to attach to his bid a copy of his resident state's current laws pertaining to such state's treatment of non-resident contractors.

Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the Owner, as bid security. Bidders shall also submit a current financial statement, if requested, by the Owner. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of 100 percent of the contract amount.

Bid documents are being made available via digital copy through Central Bidding at www.centralbidding.com or Plan House Printing at www.mgcccprojects.com . Interested bidders should log-in or register for an account to view and/or order Bid Documents. All plan holders are required to have a valid email address for registration. The cost of bid documents is non-refundable and must be purchased through the website (digital only). Bids may be submitted electronically or in hard copy form. If anyone prefers to submit their bid electronically instead of in a sealed envelope, they can do so through the Central Bidding or Plan House website. Questions regarding website registration and online orders are directed to Central Bidding at (225) 810-4814 and Plan House Printing at 228-248-0181.

Any questions that bidders might have should be directed to damon.torricelli@neel-schaffer.com. The question period will end one week prior to the bid opening date.

No bidder may withdraw their bid within one hundred twenty (120) days after the actual date of the opening thereof and each bidder shall hold their bid prices for one hundred twenty (120) days after the actual date of the opening thereof.

Mississippi Gulf Coast Community College reserves the right to reject any and all bids and to waive any informalities, technicalities, or irregularities therein.

BOARD OF TRUSTEES
MISSISSIPPI GULF COAST COMMUNITY COLLEGE

Publish Dates:
April 7, 2025
April 14, 2025